19
M21-M26-M30
6. Operation
6.
6.1 First Startup
6.1
The BÖWE Customer Service department is responsible for carrying out the first startup.
Attention: Before opening the switch panel or removing paneling,
set the main switch to " 0".
6.1.1 Preparatory Work
Set up the supply systems (electrical current, cooling water, compressed air, steam and condensate
line).
6.1.2 Filling Machine With Solvent
You must use solvents that have a flash point that is higher than the temperature stated on the machine
nameplate.
The amount of solvent needed is:
Machine M21 tank I: approximately 110 l (29 US gal)
Machine M26 tank I: approximately 135 l (36 US gal)
Machine M30 tank I: approximately 155 l (41 US gal)
Total filling amount M21: approximately 445 l (118 US gal)*
Total filling amount M26: approximately 510 l (135 US gal)*
Total filling amount M30: approximately 565 l (150 US gal)*
*Machine with 1 economy filter.
For machines with 2 economy filters: + 50 l (13 US gal)
For machines with 2 economy filters and 1 cartridge filter: + 75 l (20 US gal)
For machines with 2 economy filters and 2 cartridge filter: + 90 l (24 US gal)
(When filling the machine using the gas pendulum process, refer to diagram)
If the pump does not suction, pour about 5 liters (1.3 US gal) of solvent
into the button trap. Check that the direction of rotation is correct.