EasyManua.ls Logo

BPC instruments AMPTS III - Chapter 04: Setting up the Instrument

BPC instruments AMPTS III
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Chapter 04: Setting up the Instrument
In order to install the system properly, the steps described below need to be followed:
Step 1: Unpack the instrument and place the thermostatic water bath on a flat and stable
surface.
Step 2: Remove the blue plastic protection on the thermostatic water bath lid, mount the legs
and handles and place the lid on top of the thermostatic water bath.
Step 3: Fix the reactors after adding the samples by following the instructions below:
Step 4: Place the reactors inside the thermostatic water bath. Add a piece of tubing to the
push-in valve and attach it to one of the 2 ports on the lid (the other one is the gas outlet).