Do you have a question about the BPW ISC ZKAS 1.35 and is the answer not in the manual?
Brand | BPW |
---|---|
Model | ISC ZKAS 1.35 |
Category | Industrial Equipment |
Language | English |
Details the assembly process using a cross-type screw connection with a 40 mm hole distance, referring to Fig. 3.
Guidance for replacing existing couplings, emphasizing correct shock absorber reinstallation and distance tube threading.
Explains how to place the opened ball hitch onto the towing vehicle's coupling ball and check the indicator.
Details moving the operating lever from closed to the stop position to activate the stabiliser.
Describes slowly pulling the operating lever upwards to deactivate the stabilisation function.
Procedure to disconnect the trailer by releasing the operating lever and lifting the ball hitch.
How to check the condition of friction linings using the wear indicator (green, yellow, red).
Information on securing the ball hitch using the ROBSTOP anti-theft system via a special opening.
Specifies requirements for the coupling ball, including dimensions, cleanliness, and surface treatment (bare metal).
Instructions for cleaning the ball hitch interior, friction linings, and lubricating moving parts.
Guidance on replacing worn friction linings using a provided replacement kit.
Discusses causes of operational noises and their remedies, such as coupling ball condition or lubrication.