EasyManua.ls Logo

Bradford White Defender RG130T Series User Manual

Bradford White Defender RG130T Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Save this manual for future reference
Manual 238-51542-00C REV 08/19
SERVICE
MANUAL
Troubleshooting Guide
and Instructions for Service
(To be performed ONLY by
qualified service providers)
Models Covered
by This Manual:
RG130T*(N,X)
RG140T*(N,X)
RG150T(N,X)
RG140S*(N,X)
RG150L*(N,X)
RG150S*(N,X)
LG255H*(N.X)
LG275H*(N,X)
LG250H65*(N,X)
RG2100H*(N,X)
(*) Denotes Warranty Years
RG230S*(N,X)
RG230T*(N,X)
RG240S*(N,X)
RG240T*(N,X)
RG250H*(N,X)
RG250L*(N,X)
RG250S*(N,X)
RG250T*(N,X)
RG250H*(N,X)
RG255H*(N,X)
RG275H*(N,X)
Flammable Vapor Ignition Resistant
Water Heaters
Question and Answer IconNeed help?

Do you have a question about the Bradford White Defender RG130T Series and is the answer not in the manual?

Bradford White Defender RG130T Series Specifications

General IconGeneral
CategoryWater Heater
ManufacturerBradford White
SeriesDefender RG130T
Fuel TypeNatural Gas
Tank Capacity30 gallons
Energy Factor0.62
Warranty6 years
Energy EfficiencyEnergy Star Rated

Summary

Service Manual Overview and Tools

Safety Precautions for Water Heater Operation

General Safety Warnings

Covers essential safety rules, including gas leak procedures and handling of flammable materials.

Flammable Material Storage Hazard

Warns against storing flammable liquids like gasoline or paint thinner near the water heater.

Hydrogen Gas Production Hazard

Explains the risk of hydrogen gas buildup and precautions before using hot water.

Inner Door and Gasket Procedures (RG-I)

Inner Door Removal Procedure

Step-by-step instructions for removing the inner door assembly from the water heater.

Inner Door Gasket Replacement Procedure

Details how to inspect and replace the inner door gasket, including sealant application.

Installation of Inner Door with Gasket

Guidance on correctly reinstalling the inner door and gasket assembly, ensuring proper sealing.

Thermocouple and Thermopile Procedures (RG-II)

Closed Circuit Thermocouple Testing

Method for testing thermocouple output using a multimeter in a closed circuit.

Open Circuit Thermocouple Testing

Procedure for testing thermocouple output using a multimeter in an open circuit.

Thermocouple Replacement

Instructions for safely removing and installing a new thermocouple.

Open Circuit Thermopile Testing

Method for testing thermopile voltage output using a multimeter.

Pilot Assembly Procedures (RG-III)

Piezo Igniter Procedures (RG-IV)

Gas Valve Procedures (White Rodgers Mechanical) (RG-V)

Gas Control Procedures (Electronic & Honeywell) (RG-VI)

Burner Procedures (RG-VII)

Resettable Thermal Switch Procedures (RG-VIII)

Related product manuals