EasyManua.ls Logo

Bradley MG Series - User Manual

Bradley MG Series
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
P.O. Box 309, Menomonee Falls, WI 53052-0309
Phone: 1.800.BRADLEY Fax: 262.253.4161
bradleycorp.com
215-1586 Rev. D; ECN 13-08-025
© 2014 Bradley
Page 1 of 22 4/9/2014
Installation
MG-3/NDT
Express
®
Lavatory System
MG-Series
with NDITE
®
Infrared Control
Table of Contents
Supplies Required by Installer....................2
Dimensions ................................ 3-4
Installation Instructions ...................... 5-13
Cleaning and Maintenance .....................14
Assembly of Components ................... 15-18
Troubleshooting NDITE
®
Components ......... 19-20
Solenoid Valve Parts ..........................21
Navigator
®
Valve Maintenance and Parts ..........22
Cleaning the Strainer..........................22
Express
®
Lavatory Systems
are ADA and TAS compliant.
Patents Pending

Questions and Answers

Summary

Installation

Supplies Required by Installer

Lists necessary materials and hardware for installation, including anchors, tubing, and drain piping.

System Dimensions

Provides detailed measurements for the MG-3/NDT Express Lavatory System, including standard and juvenile heights.

Installation Instructions

Step 1: Rough-in

Details the initial rough-in process for supply lines and drain connections, including standard and TAS juvenile dimensions.

Step 2: Rough-in Wall Anchors

Instructions for installing wall anchors at specified locations for mounting the frame and bowl securely.

Step 3: Mount Frame to Wall

Guides on positioning and securely mounting the main frame to the wall, ensuring it is level and flat.

Step 4: Install Bowl Assembly

Procedures for attaching the bowl assembly to the frame and securing it to the wall anchors.

Step 5: Connecting Supply

Instructions for connecting hot/cold water supplies or single tempered supply and drain piping.

Step 6: Connecting Electrical and Tubing

Details on connecting the photovoltaic cell, power management module, and sprayhead supply tubes.

Step 7: Adjust Temperature

Steps for checking and adjusting the water temperature to ensure a safe and desired output.

Cleaning and Maintenance

Terreon and Panel Maintenance

Guidance on cleaning and maintaining the Terreon bowl and stainless steel panel, including stain removal.

Stainless Steel Panel Cleaning

Specific instructions for cleaning the stainless steel access panel, emphasizing proper materials and techniques.

Assembly of Components

Component Overview and Hardware

Identifies major components like the sprayhead, bowl, end caps, and lists associated mounting hardware.

Sensor and Solenoid Access

Instructions for accessing the solenoids, sprayhead, aerator, lens, and sensor assembly.

Solenoid Valve Parts Diagram

Detailed breakdown and parts list for the solenoid valve assembly (S07-072/S07-072A).

Troubleshooting NDT Components

Water Flow and Activation Problems

Addresses issues like water not shutting off, multiple stations not activating due to lighting or pressure.

Stop Valve Troubleshooting

Solutions for problems where water drips or does not flow from the sprayhead, or delivers only hot/cold water.

Thermostatic Mixing Valve Troubleshooting

Valve Leaks and Temperature Issues

Diagnoses and resolves external leaks, improper water temperature, and temperature fluctuations.

Limited Water Flow Resolution

Provides steps to address issues of limited water flow, including checking supplies and cleaning strainers.

Summary

Installation

Supplies Required by Installer

Lists necessary materials and hardware for installation, including anchors, tubing, and drain piping.

System Dimensions

Provides detailed measurements for the MG-3/NDT Express Lavatory System, including standard and juvenile heights.

Installation Instructions

Step 1: Rough-in

Details the initial rough-in process for supply lines and drain connections, including standard and TAS juvenile dimensions.

Step 2: Rough-in Wall Anchors

Instructions for installing wall anchors at specified locations for mounting the frame and bowl securely.

Step 3: Mount Frame to Wall

Guides on positioning and securely mounting the main frame to the wall, ensuring it is level and flat.

Step 4: Install Bowl Assembly

Procedures for attaching the bowl assembly to the frame and securing it to the wall anchors.

Step 5: Connecting Supply

Instructions for connecting hot/cold water supplies or single tempered supply and drain piping.

Step 6: Connecting Electrical and Tubing

Details on connecting the photovoltaic cell, power management module, and sprayhead supply tubes.

Step 7: Adjust Temperature

Steps for checking and adjusting the water temperature to ensure a safe and desired output.

Cleaning and Maintenance

Terreon and Panel Maintenance

Guidance on cleaning and maintaining the Terreon bowl and stainless steel panel, including stain removal.

Stainless Steel Panel Cleaning

Specific instructions for cleaning the stainless steel access panel, emphasizing proper materials and techniques.

Assembly of Components

Component Overview and Hardware

Identifies major components like the sprayhead, bowl, end caps, and lists associated mounting hardware.

Sensor and Solenoid Access

Instructions for accessing the solenoids, sprayhead, aerator, lens, and sensor assembly.

Solenoid Valve Parts Diagram

Detailed breakdown and parts list for the solenoid valve assembly (S07-072/S07-072A).

Troubleshooting NDT Components

Water Flow and Activation Problems

Addresses issues like water not shutting off, multiple stations not activating due to lighting or pressure.

Stop Valve Troubleshooting

Solutions for problems where water drips or does not flow from the sprayhead, or delivers only hot/cold water.

Thermostatic Mixing Valve Troubleshooting

Valve Leaks and Temperature Issues

Diagnoses and resolves external leaks, improper water temperature, and temperature fluctuations.

Limited Water Flow Resolution

Provides steps to address issues of limited water flow, including checking supplies and cleaning strainers.

Bradley MG Series Specifications

General IconGeneral
Product LineMG Series
FinishChrome
Pressure Requirement20-80 PSI
ADA CompliantYes
MaterialBrass

Related product manuals