EasyManua.ls Logo

Breezaire WKL SERIES User Manual

Default Icon
5 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
8610 Production Avenue San Diego, California 92121 (858) 566-7465 Fax (858) 566-1943
BREEZAIRE Products Company - 8610 Production Avenue - San Diego, CA USA 92121 - (858) 566-7465
WKL SERIES
(USA ONLY)
--INSTALLATION INSTRUCTIONS--
Thank you for choosing a BREEZAIRE cooling unit. We believe our products are
the best on the market and will provide many years of trouble-free service.
Please take a few minutes and read this entire instruction before beginning the
installation.
MODEL _____________________ SERIAL NUMBER ______________________
INSTALLED BY ______________________________ DATE__________________
While great effort has been made to provide accurate guidelines, BREEZAIRE cannot warrant its units to properly cool
a particular enclosure. Customers are cautioned that enclosure construction, unit location and many other factors can affect
the operation and performance of the unit. Therefore the suitability of the unit for a specific enclosure or application must be
determined by the customer and cannot be warranted by BREEZAIRE.
Before removing the cooling unit from the box, please inspect for damage, which might have
occurred during shipping. If damage is found, notify the Freight Company immediately.
BREEZAIRE is not responsible for any damages during shipping.
Question and Answer IconNeed help?

Do you have a question about the Breezaire WKL SERIES and is the answer not in the manual?

Breezaire WKL SERIES Specifications

General IconGeneral
BrandBreezaire
ModelWKL SERIES
CategoryAir Conditioner
LanguageEnglish

Summary

WKL Series Installation Instructions

Enclosure Construction Requirements

Vapor Barrier and Insulation

Walls, floors, ceilings require vapor barrier and R-11/R-19 insulation.

Sealing and Joint Integrity

Seal all joints, openings, and frames to prevent air and moisture leaks.

Door Specifications

Insulated doors (R-11) must be tightly sealed with weather stripping.

Initial Installation Steps

Pre-Installation Unit Check

Inspect for shipping damage. Test unit above 65°F for airflow.

Physical Unit Installation

Unit Operation and Control

Routine Maintenance

Condenser Coil Cleaning Schedule

Clean condenser coil every 3 months using a vacuum cleaner.

Troubleshooting Enclosure Issues

Condensate Management

Related product manuals