EasyManua.ls Logo

Bryant ASPAS1BBL015 - Table of Contents

Bryant ASPAS1BBL015
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table of Contents
Bryant Liquid-cooled 15 kW Generators
Bryant 1
INTRODUCTION ..................................IFC
SAFETY RULES ......................................2
Section 1 — GENERAL
INFORMATION..................4
1.1 Generator ......................................................4
1.2 Transfer Switch ............................................4
1.3 Automatic System Operation ........................4
1.4 Generator AC Connection Systems................4
1.5 Main Circuit Breaker ....................................4
1.6 Generator Fuel System ..................................5
1.7 Engine Protective Devices ..............................5
1.8 Unpacking ....................................................6
1.9 Lifting the Generator ....................................6
1.10 Specifications ................................................6
1.11 Fuel Consumption ........................................7
1.12 Reconfiguring the Fuel System ......................7
1.13 Torque Specifications ....................................7
1.14 Engine Oil Recommendations ......................8
1.15 Coolant Recommendations............................8
1.16 Before Installation ........................................8
Section 2 — INSTALLATION ................8
2.1 Standby Generator Installation ....................8
2.2 Generator Location ......................................9
2.3 Generator Mounting and Support ................9
2.4 Basic Standby Electric System ......................9
2.5 Emergency Circuit Isolation Method ..........10
2.6 Total Circuit Isolation Method ....................10
2.7 Grounding the Generator ............................10
2.8 Generator AC Neutral Connections ............10
2.9 Transfer Switch Signal Connections............10
2.10 Battery Installation ......................................11
2.11 Preparation Before Start-Up ........................11
Section 3 OPERATION....................12
3.1 Control Console Components......................12
3.2 Manual Transfer and Startup......................13
3.3 Automatic Operation ..................................13
3.4 Weekly Exercise Cycle..................................13
Section 4 — MAINTENANCE ..............14
4.1 Maintenance Performed by Authorized
Service Facilities ..........................................14
4.2 Cooling System............................................14
4.3 Overload Protection for Engine DC
Electrical System ........................................14
4.4 Checking Fluid Levels ................................14
4.5 Maintenance Owner/Operator
Can Perform ................................................15
4.6 Miscellaneous Maintenance ........................16
4.7 Scheduled Maintenance ..............................18
Section 5 — TROUBLESHOOTING......21
5.1 Troubleshooting Points................................21
Section 6 — NOTES............................22
Section 7 — INSTALLATION
DIAGRAM ......................23
Section 8 — ELECTRICAL DATA ........24
Section 9 — EXPLODED VIEWS AND
PARTS LISTS ................28
Section 10 — WARRANTY .................44

Table of Contents

Related product manuals