EasyManua.ls Logo

Buck M500 - Installation

Default Icon
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION C
INSTALLATION
Location:
The BUCK M500 should be located on a level, firm work surface free from vibration, R.F. energy
sources and excessive heat. (Less than 85ºF) A clean environment will greatly increase the life of the
instrument. Damage from caustic fumes, gasses or particulate matter is not under warranty.
Unpacking:
Inspect the instrument controls and cabinet for evidence of damage during shipment. Report any
damage to the carrier and BUCK Scientific immediately.
CAUTION!!
It is advisable to allow the instrument to remain in it's shipping carton for at least 12 hours before
unpacking to avoid condensate forming on reflecting optics.
After unpacking the instrument, it is necessary to raise the hinged cover and remove the
shipping security tie/wraps from around the slit and wavelength arms. Remove the plastic shield
that is taped in front of the grating.
6

Related product manuals