EasyManua.ls Logo

BYD DESS-B08P03A-A - Installation Placement; Installation & Placement

BYD DESS-B08P03A-A
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Distributed Energy Storage System Build Your Dreams
3
2.3
Installation Placement
The DESS cabinet shall be placed on a level surface and vertically installed. The correct placement of
the system cabinet ensures the reliability and safety of the batteries. The DESS cabinet must also be
installed in a weatherproof location. See warnings below for further information.
Warning:
Ensure the installation place has with good ventilation, and the ambient environment
meets the operation requirements of product;
No flammable and explosive goods shall be placed within 4 meters of system;
Ambient temperature for the installation should be in the range of 0 to 45.
Warning:
Smoking and fireworks are not allowed near the batteries;
Ensure the area around the system cabinet is clean and ventilated;
Ensure the wiring and external circuit protection meets the local general standards,
failure to follow these guidelines may cause injury.
Fig 2.2 Correct placement of battery cabinet