Do you have a question about the BYD Premium HVS 5.1 and is the answer not in the manual?
Details regarding the document's validity, scope, and target audience.
Specifies the battery system's purpose and compatibility with photovoltaic systems.
Crucial safety advice to prevent injury and property damage during operation.
Actions to take in case of electrolyte leakage from battery modules.
Guidelines and equipment for extinguishing battery fires.
Instructions for safe handling and storage of battery modules.
Hazards associated with touching live components or DC cables.
Actions to prevent permanent damage to the battery system.
Ensuring the system is integrated into existing surge protection.
Advice to read and observe the inverter manufacturer's safety information.
Symbols indicating document reference and grounding conductor connection.
Symbols related to proper disposal and EU compliance.
Symbols for careful handling, orientation, and keeping the system dry.
Symbols indicating fire hazards, electrical voltage, and danger zones.
Symbol warning to keep battery modules away from children.
Detailed technical specifications for BYD Battery-Box HVS models.
Detailed technical specifications for BYD Battery-Box HVM models.
Key operating parameters including temperature, communication, and efficiency.
Lists all components and accessories included in the package.
Lists the necessary tools for system installation and maintenance.
Guidelines for selecting an appropriate installation site.
Rules and constraints for connecting multiple battery units.
Visual guide to the main steps involved in installing the battery system.
Diagrams for CAN/RS485 and Ethernet communication connections.
Diagrams illustrating parallel connection of multiple battery towers.
Step-by-step guide for connecting the grounding conductor.
Procedure for connecting the communication cable to the inverter.
Connection options for SMA SBS 2.5/3.7/5.0/6.0 inverters.
Connection options for SMA STR5.0-10.0 SE inverters.
Connection options for Kostal PLENTICORE Plus/BI inverters.
Connection options for Kostal PIKO MP Plus and PIKO BA inverters.
Connection options for Kaco blueplanet hybrid inverters.
Connection options for GoodWe/Viessmann inverters.
Connection options for SUNGROW SH5.0/6.0/8.0/10RT inverters.
Connection options for SUNGROW SH3.0/3.6/4.0/5.0/6.0 RS inverters.
Connection options for Fronius Symo Hybrid inverters.
Connection options for Fronius Primo Gen24 Plus/Symo Gen24 Plus inverters.
Connection options for Ingeteam inverters.
Connection options for Solis inverters.
Connecting data cables for internal communication between battery systems.
Close-up views of connection points for clarity.
Steps required to turn on the battery system.
Instructions on how to switch on the connected inverter.
The sequence of operations for initiating system startup.
Guide to configuring the battery system using the Be Connect 2.0 mobile application.
Correct order for switching off the system components.
Procedure for adding modules to extend the battery system.
Explanation of LED indicators for various system states.
| Brand | BYD |
|---|---|
| Model | Premium HVS 5.1 |
| Category | Camera Accessories |
| Language | English |











