EasyManua.ls Logo

BYD Battery-Box Premium HVS 10.2 User Manual

BYD Battery-Box Premium HVS 10.2
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image

Other manuals for BYD Battery-Box Premium HVS 10.2

Question and Answer IconNeed help?

Do you have a question about the BYD Battery-Box Premium HVS 10.2 and is the answer not in the manual?

BYD Battery-Box Premium HVS 10.2 Specifications

General IconGeneral
Usable Energy10.24 kWh
Operating Temperature Range-10°C to +50°C
Battery TypeLithium Iron Phosphate (LiFePO4)
CommunicationCAN / RS485
IP RatingIP55
Warranty10 years
ScalabilityUp to 6 modules in parallel
CertificationsCE, IEC 62619, UN38.3
Cycle Life6000 cycles

Summary

Safety

2.2. IMPORTANT SAFETY INSTRUCTIONS

Crucial safety guidelines for preventing injury and damage.

2.2.1. Battery Module Leakage

Actions to take in case of electrolyte leakage from battery modules.

2.2.2. Firefighting Measures

Procedures and equipment for fighting battery module fires.

2.2.4. Warning of Electric Shock

Hazards and precautions related to electric shock.

Symbols on the Battery System

Electrical and Danger Symbols

Symbols warning of electrical voltage and danger zones.

Instructions

Installation Location

Connection Limitation

Series and Parallel Connection Limits

Defines limits for series and parallel connections of battery modules.

Installation

Prepare Installation Base and BCU

Steps for preparing the base, positioning BCU, and wall mounting.

Assemble and Stack Battery Modules

Guidance on assembling and stacking the battery modules.

Connect BCU and Data Cables

Instructions for connecting BCU, module data cables, and communication cables.

Connection Diagram

System Connection Overview

Illustrates the overall connection of the inverter, BCU, and battery system.

Connecting the Grounding Conductor

Grounding Connection Steps

Guides through preparing and connecting the grounding conductor.

Communication Cable Connection to Inverter

General Connection Procedure

Pre-connection checks and steps for connecting communication cables.

Connecting the Data Cable for the Internal Communication

Connecting the Network

Network Cable Connection

Steps for connecting the network cable to the BCU.

DC Connection

DC Cable Connection Procedure

Detailed steps for connecting DC cables to the BCU and battery modules.

Commissioning

14.1 Battery System Switch-on

Procedure for switching on the battery system.

Operation

15.1 Start-up Procedure

Sequence for starting up the battery system and inverter.

15.2 Switch-off Procedure

Sequence for shutting down the battery system and inverter.

LED Status