EasyManua.ls Logo

C.E.C. 530CD - Installation Method for each Leaf Switch

C.E.C. 530CD
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
METHOD
FOR
EACH
LEAF
SWITCH
eLoading
limit
Switch
With
the
table
load
in
the
open
condition,
fix
the
switch
as
in
the
diagram
so
that
the
tip
of
the
leaf
switch
is
positioned
in
the
center
of
the
lever
rock
notch.
0.5
0.2mm
between
Terminals
AMI
B)
Same
Gap
Set
the
space
between
the
left
and
right
terminals
of
the
leaf
switch
to
0.5
£0.2mm.
e
Pickup
Limit
Switch
As
in
the
diagram,
install
level
with
the
chassis.
Set
a
space
of
0.5
+0.2mm
between
the
upper
and
lower
switch
terminals.
0.5+0.2mm
id
0.5
+0.2mm
~17—
e
Open/Close
Switch
install
so
that
the
tip
of
the
leaf
switch
and
the
slide
eject
are
contacting,
as
shown
in
the
diagram.
Set
a
space
of
0.2
to
0.5mm
between
the
terminals
of
the
switch.
Touching
0.2
~
0.5mm