61
ENG
Commissioning report / maintenance documentation
WTS LARGE +0300131IT rel. 1.0 - 05.09.2022
14. COMMISSIONING REPORT /
MAINTENANCE DOCUMENTATION
Commissioning report for CAREL reverse osmosis systems ROC and ROL
Unit
Type Serial number
Type of pressure expansion vessel
Date of maintenance
Company / name
Customer
Commercial / Private
Street / Number
Postal code / City
Contact on site Telephone number
Checked / Value Remarks
Unit condition
Unit delivered complete?
yes no
Transport locks removed?
yes no
All hoses and connections checked for
damage?
yes no
All detachable PVC screw connections
tightened? (ROL)
yes no
All electrical cables checked for external damage?
yes no
General
Distance appliance - pressure expansion vessel meters
Distance pressure expansion vessel - consumer meters
Connection to the drinking water system
yes no
Softening system connected?
yes no
Hoses to the anti-scalant pump and canister con-
nected (if available)?
yes no
Prelter and membranes in position?
yes no
Feed water
Total hardness °fH
Conductivity μS/cm
Temperature °C
Water inlet pressure bar
Permeate / Konzentrate
Conductivity permeate μS/cm
Conductivity concentrate μS/cm
Conductivity Mixwater (only ROC with blending kit) μS/cm
Operation pressure bar
Permeate quantity l/h
Concentrate quantity l/h
Demineralisation rate %
Switch-on pressure bar
Switch-o pressure bar
Antiscalant dosing (if available) activated according
to operating instructions and canister lled to mixing
ratio?
yes no
Note: The commissioning values are to be documented as a basis for the system assessment.
A water analysis is to be attached to this protocol.
Datum / Sign