HEATING UP:
LM Version: during the warming up, the milker solenoid valve will stay open from 0°c to 95°c and the
barista steam wand from 50°C to 95°C. This will release the air from the boiler
COF Version: during this stage, keep the steam lever open for a few seconds, this operation will
release the air from the boiler