30HXC 080-375
30GX 082-358
Screw Compressor
Water-Cooled Liquid Chillers and
Air-Cooled Liquid Chillers
30HXC Nominal cooling capacity 290-1325 kW
30GX Nominal cooling capacity 285-1205 kW
50 Hz
Installation, operation and maintenance instructions
GLOBAL CHILLER

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Carrier 30HXC120 and is the answer not in the manual?

Carrier 30HXC120 Specifications

General IconGeneral
Cooling Capacity120 tons
Compressor TypeScrew
RefrigerantR-134a
Voltage460V
Phase3

Summary

Safety Considerations

General Safety Precautions

Covers hazards like refrigerant venting, oxygen use, test pressures, welding, electrical safety, and handling liquid refrigerant.

High Condensing Temperature Electrical Data

Application Data and Operating Ranges

Application Data and Operating Ranges (CONT.)

Unit Installation Procedures

Lifting and Handling Procedures

Lifting and Handling Procedures (CONT.)

Water Piping Connections

Electrical Specifications

Wire Sizing Recommendations

Field Control Wiring Guide

Maintenance Procedures

15.1 - Refrigerant charging - adding charge

Important precautions and warnings regarding refrigerant charging for R-134a units.

15.2 - Indication of low charge on a 30HXC system

How to identify and verify low refrigerant charge in 30HXC systems using sightglass and EXV position.

15.2.1 - To add charge to the 30HXC systems

Step-by-step procedure for adding refrigerant charge to 30HXC systems.

15.2.2 - Indication of low charge on 30GX systems

How to identify and verify low refrigerant charge in 30GX systems using sightglass and temperature readings.

Maintenance Procedures (CONT.)

15.3 - Pressure transducers

Input usage for measuring discharge, suction, and oil pressures for unit control.

15.4 - Oil charging - low oil recharging

Procedure for adding oil charge to 30HXC/GX systems if low oil level alarms persist.

30HXC/GX Start-Up Checklist

Preliminary Information

Fields for job name, location, contractor, distributor, and start-up personnel.

Preliminary Equipment Check

Checks for shipping damage, unit level, power supply, wiring, and connections.

Check Air Handling Systems

Verifies operation of air handlers, water valves, piping, and air venting.

30HXC/GX Start-Up Checklist (CONT.)

Check condenser system (30HXC)

Checks condenser water valves, piping, air venting, and pump operation.

Check pressure drop across the condenser (30HXC only)

Instructions to plot condenser pressure drop and determine flow rates.

Unit start-up

Checks CWP starter, oil heaters, valve positions, leak checks, and refrigerant leaks.

Perform TEST function (indicate positive result)

Guide for performing the TEST function and checking for alarms.

Check cooler water loop

Verifies water loop volume, corrosion inhibitor, freeze protection, and piping.

To start the chiller

Final checks before starting the chiller, ensuring service valves are open and pumps are on.

Check pressure drop across the cooler

Instructions to plot cooler pressure drop and determine flow rates.

Temperatures and pressures

Fields to record stabilized operating temperatures and pressures for various components.