EasyManua.ls Logo

Carrier 40UV - Page 33

Carrier 40UV
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(SEE NOTE 5)
NOTES:
1. Not all components shown for clarity.
2. This drawing appliesto 2000 cfm unitsonly.
3. Remove shaft, motor and coupling prior to removing bearing.
Refer lo Removal and P,e_nstaLlat_ninstruotio,_s.
4. Install sleeve bearing with oilcup facing up and towards the rear of
the assembly.
5. Refer to Fig. 9 for motor-coupling and shaft-coupling toferances.
(SEE NOTE 4)
_ ^*
®
LEFT SIDE
VtEW
Fig. 13 -- 40UH200 Ventilator Blower Drive Train Assembly
UNrT
BOTTOM
33

Other manuals for Carrier 40UV

Related product manuals