8
installation manual
Drainage test
Check whether the drainpipe is clear.
New construction homes should have this test done
prior of walls and ceilings.
Refer to the Fig.7-1 for the installation of the pipes.
1.5m~2m
Insulating
material
Downward declivity
lower than 1/100
Bend
Sshape
VP30
Downw ard declivity
lower t han 1/100
Put as deep as possible
(ab out 10cm)
Fig. 7-1
8. WIRING
The unit shall be installed in accordance with
all standards and regulations.
The air conditioner should use separate power supply
with rated voltage.
The external power supply to the air conditioner should
have ground wiring, which is linked to the ground wiring
of the indoor and outdoor unit.
The wiring work should be done by qualified persons
according to circuit drawing.
An all-pole disconnection device which has at least 3mm
sepaaration distance in all pole and a residual current
device (RCD) with the rating of above 10mA shall be
incorporated in the fixed wiring according to the national
rule.
Be sure to locate the power wiring and the signal wring
well to avoid cross-disturbance.
Do not turn on the power until you have checked
carefully after wiring.
2) The outdoor unit
a. Whether there is vibration or abnormal noise during
operation.
b. Whether the generated wind, noise, or condensed of by
the air conditioner have influenced your neighborhood.
c. Whether any of the refrigerant is leaked.
A protection feature prevents the air conditioner from being
started for approximately 3 minutes after shut o f f.
CAUTION
1) The indoor unit
a. Whether the switch on the remote controller works well.
b. Whether the buttons on the remote controller works
well.
c. Whether the air flow louver moves normall y .
d. Whether the room temperature is adjusted well.
e. Whether the indicator lights normall y .
f. Whether the temporary buttons works well.
g. Whether the drainage is normal.
h. Whether there is vibration or abnormal noise during
operation.
I. Whether the air conditioner heats well in the case of the
HE A TING/COOLING type.
4
Set the air conditioner under the mode of "COOLING" with
the remote controller, and check the following points. If there
is any malfunctio n , please resolve it according to the chapter
"Troubleshooting" in the "Owner's Manual".
T est operation
9. TEST OPERATION
Th e tes t operatio n mus t b e carrie d ou t afte r th e entir e
installation has been completed.
Please confirm the following points before the test operation:
2
1
Accordin g t o th e user' s requirement , instal l th e remot e
controlle r fram e wher e th e remot e controller' s signa l ca n
reach the indoor unit smoothl y .
3
Th e powe r voltag e f it s th e rate d voltag e o f t h e ai r
conditione r .
There is no obstacle at the outlet and inlet of the outdoor
and indoor units.
The gas-side and liquid-side stop valves are both opened.
The air conditioner is pre-heated by turning on the powe r .
The indoor unit and outdoor unit are installed properl y .
T ubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The heating insulation works well.
The ground wiring is connected correctl y .
The length of the tubing and the added stow capacity of
the refrigerant have been recorded.