EasyManua.ls Logo

Carrier 48TC**16 User Manual

Carrier 48TC**16
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
48TC**16
Single Package Rooftop
Gas Heating/Electric Cooling Unit
with Puronr (R---410A) Refrigerant
Size 16
Installation Instructions
NOTE: Read the entire instruction manual before starting
the installation
TABLE OF CONTENTS
SAFETY CONSIDERATIONS 2....................
INSTALLATION 4...............................
Jobsite Survey 4................................
Step 1 -- Plan for Unit Location 4..................
Roof Mount 5...............................
Step 2 -- Plan for Sequence of Unit Installation 5......
Curb--Mount Installation 5.....................
Pad--Mount Installation 5......................
Frame--Mount Installation 5....................
Step 3 -- Inspect Unit 5...........................
Step 4 -- Provide Unit Support 5...................
Roof Curb Mount 5..........................
Slab Mount (Horizontal Units Only) 5...........
Alternate Unit Support
(In Lieu of Curb or Slab Mount) 5..............
Step 5 -- Field Fabricate Ductwork 7................
Step 6 -- Rig and Place Unit 7.....................
Positioning on Curb 8........................
Step 7 -- Convert to Horizontal and Connect Ductwork 8...
Step 8 -- Install Outside Air Hood 9................
Economizer Hood Removal and Setup
Factory Option 9............................
Two Position Damper Hood Removal and Setup
Factory Option 9............................
Economizer Hood and Two--Position Hood 10.....
Step 9 -- Install Flue Hood 10.....................
Step 10 -- Install Gas Piping 11....................
Factory--Option Thru--Base Connections
(Gas Connections) 11.........................
Step 11 -- Install External Condensate Trap and Line 13..
Step 12 -- Make Electrical Connections 14...........
Field Power Supply 14........................
All Units 15................................
Units without Factory--Installed Disconnect 15....
Units with Factory--Installed Disconnect 15.......
Convenience Outlets 16.......................
Factory--Option Thru--Base Connections
(Electrical Connections) 18....................
Units without Thru--Base Connections 18.........
Field Control Wiring 18.......................
Thermostat 18...............................
Unit without Thru--Base Connection Kit 19.......
Heat Anticipator Settings 19...................
Humidi--MiZer
R
Control Connections 20..........
Humidi--MiZer -- Space RH Controller 20........
PremierLinkt (Factory Option) 21.................
Supply Air Temperature (SAT) Sensor 25.........
Outdoor Air Temperature (OAT) Sensor 25.......
EconoMi$er2 25.............................
Field Connections 25..........................
Space Sensors 27............................
Connect Thermostat 27.......................
Configure the Unit for Thermostat Mode 27......
Economizer Controls 28........................
Indoor Air Quality (CO
2
sensor) 28.............
Outdoor Air Quality Sensor 28.................
Space Relative Humidity Sensor or
Humidistat Connections 29....................
Smoke Detector/Fire Shutdown (FSD) 30.........
Filter Status Switch 30........................
Supply Fan Status Switch 30...................
Remote Occupied Switch 30...................
Power Exhaust (output) 30.....................
CCN Communication Bus 31..................
RTU Open Control System 32.....................
Supply Air Temperature (SAT) Sensor 35.........
Outdoor Air Temperature (OAT) Sensor 35.......
EconoMi$er2 35.............................
Field Connections 35..........................
Space Temperature (SPT) Sensors 36............
Indoor Air Quality (CO
2
)Sensor 36.............

Table of Contents

Questions and Answers:

Carrier 48TC**16 Specifications

General IconGeneral
BrandCarrier
Model48TC**16
CategoryAir Conditioner
LanguageEnglish

Summary

Installation Instructions

Safety Considerations

Critical safety warnings and precautions for unit installation and operation.

Installation Procedures

Step-by-step guide for unit placement, ductwork, and piping.

Electrical Connections

Procedures for making all field power and control wiring connections.

Control System Integration

Humidi-Mizer Control Wiring

Connecting space relative humidity sensors for dehumidification control.

PremierLink Control System

Configuration and connection of PremierLink for advanced control.

RTU Open Control System

Overview and connections for the RTU Open multi-protocol control system.

Sensor and Input Connections

Economizer and Air Quality Sensors

Installing CO2 sensors for indoor and outdoor air quality monitoring.

Humidity Sensing and Control

Connecting humidity sensors, humidistats, and smoke detectors.

Discrete Input Monitoring

Connecting filter status, fan status, and occupancy switches.

Communication and Networking

CCN Communication Bus

Wiring and configuration of the CCN communication bus.

RTU Open Protocols and Wiring

Configuring RTU Open for BACnet, Modbus, N2, and LonWorks.

Local Access and Troubleshooting

Using BACview for unit access and troubleshooting communication issues.

Factory Options and Final Steps

Adjust Factory-Installed Options

Configuring unit settings for installed options like smoke detectors.

Install Accessories

Guidelines for installing various optional accessories.

Related product manuals