73
APPENDIX II. PHYSICAL DATA (cont)
Table 25 – PHYSICAL DATA − VERTICAL (HEATING) 15 − 27.5 TONS
48TC**17 48TC**20 48TC**24 48TC**28 48TC**30
Gas Connection
1 1 1 1 1
5 -13 /
0.18-0.47
5 -13 /
0.18-0.47
5 -13 /
0.18-0.47
5 -13 /
0.18-0.47
5 -13 /
0.18-0.47
11-13 /
0.40-0.47
11-13 /
0.40-0.47
11-13 /
0.40-0.47
11-13 /
0.40-0.47
11-13 /
0.40-0.47
Heat Anticipator setting (Amps)
0.14 0.14 0.14 0.14 0.14
0.14 0.14 0.14 0.14 0.14
Natural Gas Heat
LOW
# of stages / # of burners (total) 2 / 5 2 / 5 2 / 5 2 / 5 2 / 5
Connection Size 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT
Rollout switch opens / closes 195 / 115 195 / 115 195 / 115 195 / 115 195 / 115
Temperature Rise 25 - 55 25 - 55 25 - 55 25 - 55 25 - 55
MED
# of stages / # of burners (total) 2 / 7 2 / 7 2 / 7 2 / 7 2 / 7
Connection Size 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT
Rollout switch opens / closes 195 / 115 195 / 115 195 / 115 195 / 115 195 / 115
Temperature Rise 30- 60 30- 60 30- 60 30- 60 30- 60
HIGH
# of stages / # of burners (total) 2 / 10 2 / 10 2 / 10 2 / 10 2 / 10
Connection Size 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT
Rollout switch opens / closes 195 / 115 195 / 115 195 / 115 195 / 115 195 / 115
Liquid Propane Heat
LOW
# of stages / # of burners (total) 2 / 5 2 / 5 2 / 5 2 / 5 2 / 5
Connection Size 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT
Rollout switch opens / closes 195 / 115 195 / 115 195 / 115 195 / 115 195 / 115
Temperature Rise 25 - 55 25 - 55 25 - 55 25 - 55 25 - 55
MED
# of stages / # of burners (total) 2 / 7 2 / 7 2 / 7 2 / 7 2 / 7
Connection Size 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT
Rollout switch opens / closes 195 / 115 196 / 115 197 / 115 198 / 115 199 / 115
Temperature Rise 30- 60 30- 60 30- 60 30- 60 30- 60
HIGH
# of stages / # of burners (total) 2 / 10 2 / 10 2 / 10 2 / 10 2 / 10
Connection Size 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT 3/4" NPT
Rollout switch opens / closes 195 / 115 195 / 115 195 / 115 195 / 115 195 / 115
Temperature Rise 35- 65 35- 65 35- 65 35- 65 35- 65