EasyManua.ls Logo

Carrier 58PAV - Page 19

Carrier 58PAV
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHECKLIST—INSTALLATION
LOAD CALCULATION
____________ Heating Load (Btuh)
____________ Cooling Load (Btuh)
____________ Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________ Unconfined Space
____________ Confined Space
VENTING
____________ NFGC (United States)
____________ NSCNGPIC (Canada)
____________ Local Codes
____________ 1/4-in. Upward Slope
____________ Joints Secure
____________ See Vent Table Instructions
CHECKLIST—START-UP
____________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
____________ Temperature Rise Adjusted
____________ Thermostat Anticipator Setting Adjusted or
____________ Thermostat Cycle Rate (3 cycles per Hr)
CHECK SAFETY CONTROLS OPERATION
____________ Primary Limit
____________ Pressure Switches
____________ Draft Safeguard Switch
THERMOSTAT
____________ Manufacturer
____________ Model Number
19

Other manuals for Carrier 58PAV

Related product manuals