EasyManua.ls Logo

Carrier Integra 50X - Evaporator Mounting Preparation

Carrier Integra 50X
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation & Commissioning Manual:
Neos 100S, 20X, 30S, 35X, 40X, 50X
62-11165 Rev D
®
8
Evaporator Mounting Preparation
35X
40X
18.5”
(470)
33.66”
(855)
17.72”
(450)
30.71”
(780)
17.72”
(450)
40.55” (1,030)
Remove evaporator access panels. If the box has mounting studs, fasten the evaporator using supplied
hardware; otherwise, mark the mounting holes as indicated above (depending on unit model). Leave a
minimum of 6” (150mm) between the box wall and the rear of the evaporator.
50X
21.85”
(555)
58.27” (1,480)
29.13” (740)
53.54” (1,360)
26.77” (680)
20X
30S
15.95”
(405)
20.86”
(530)
Neos
100S

Related product manuals