Engine-Engineandcrankcase
31.Installthebreatherline(hoseandventingcheckvalve)
totheengine.Tightentheclampto3.4N·m(2.5lbft)
LEIL17WHL0094AB24
32.InstalltheST,CPWRandbatterypositivecables(1)to
theenginestarter.Torquethenutto22.5–29.4N·m
(16.6–21.7lbft).
Installthenegativebatterycable(2),groundstrap(3)
andXM1Ccable(4)totheenginestarter.
InstalltheGND_ENG1,GND_ENG3,GND_ENG4ca-
bles(5)andGND_CENG1,GND_CENG2cables(6)
totheengine.Torquethenutsto22–24N·m(16.2–
17.7lbft).
LEIL17WHL0114AB25
33.Securethecablestotheenginewithclamps.
LEIL16WHL0570AB26
34.Installtheheatersupplyhose(1)totheengine.Se-
curethehosetotheywheelcoverwithclamp(2)and
existinghardware.
LEIL17WHL0115AB27
48083741_EN31/07/2018
10.1[10.001]/25