EasyManua.ls Logo

CDI TORQUE SURETEST - Page 26

CDI TORQUE SURETEST
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SETUP AND PROGRAMMING CHAPTER 3
SURETEST Base Unit Controls
Refer to the illustration below when performing the power-up and programming procedures.
Figure 3-5: SURETEST Controls
SURETEST Graphic Display
Power Switch
– Front Panel Membrane Function Keys
Powering the Equipment
To power the equipment, press the power button on the front of the SURETEST.
• At POWER ON, the SURETEST performs a self-test and momentarily displays the results on
the display.
• With no transducer installed, the display then reads:
pplying power with the transducer connected, or when connecting a transducer while the
• When a
power is on, the display momentarily reads:
Zerotare prompt
3-3

Related product manuals