EasyManuals Logo

CECOR SE15 Series User Manual

CECOR SE15 Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
16
SE15 OPERATIONS MANUAL & PARTS LIST (Rev. 8/2020)
2. TUCK HANDLES IN BETWEEN FILTER AND PERFORATED BASKET. MAKE
SURE COTTON BANDING(POLY-FILTER) OR SIDES OF FILTER ARE LYING
ON POT LID GASKET COMPLETELY WITHOUT CREASES.
3. RE-INSTALL POT LID AND WING NUTS.
4.
5. WITH UNIT IN SUCTION MODE AND POT LID CAPPED, TURN UNIT ON AND
TO TIGHTEN WING NUTS. THIS PROVIDES EQUAL PRESSURE ON THE
POT LID GASKET CREATING BEST SEAL.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CECOR SE15 Series and is the answer not in the manual?

CECOR SE15 Series Specifications

General IconGeneral
BrandCECOR
ModelSE15 Series
CategoryIndustrial Equipment
LanguageEnglish