EasyManua.ls Logo

Cessna 150 Series - INSTRUMENT PANEL; DESCRIPTION; REMOVAL AND INSTALLATION; SHOCK-MOUNTS

Cessna 150 Series
284 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15-3.
INSTRUMENT
PANEL.
or
back
plate
could
change
calibration
of
gages.
15-4.
DESCRIPTION.
The
instrument
panel
assem-
15-10.
PITOT
AND
STATIC
SYSTEMS.
bly
consists
of
a
stationary
and
shock-mounted
panel.
The
stationary
panel contains
fuel
and
engine
instru-
15-11. DESCRIPTION.
(Refer
to
figure
15-2.)
ments,
which
are
NOT
sensitive
to
vibration.
The
The
pitot
system
conveys
ram
air
pressure
to
the
shock-mounted
panel
contains
major
flight
instru-
airspeed
indicator.
The
static
system
vents
vertical
ments
such
as
horizontal
and
directional
gyros
which
speed
indicator,
altimeter
and
airspeed
indicator
to
ARE
affected
by
vibration.
Most
of
the
instruments
atmospheric
pressure
through
plastic
tubing
connect-
are
screw-mounted
on
the
panel
backs.
ed
to
a
static
port.
A
static
line
sump
is
installed
at
source
button
to collect
condensation
in
static
system.
15-5.
REMOVAL
AND
INSTALLATION.
(Refer
to
A
pitot
tube
heater
may
be
installed.
The
heating
figure
15-1.
The
stationary
panel
is
secured
to
en-
element
is
controlled
by
a
switch
at
instrument
panel
gine
stringers
and
a
forward
fuselage
bulkhead
and
and powered
by
the
electrical
system.
ordinarily
is
not
considered
removable.
The
shock-
mounted
panel
is
secured
to
stationary
panel
with
15-12.
MAINTENANCE.
Proper
maintenance
of
rubber
shock-mounted
assemblies.
To
remove
shock-
pitot
and
static
system
is
essential
for
proper
op-
mounted
panel
proceed
as
follows:
eration
of
altimeter,
vertical
speed
and
airspeed
a.
Unscrew
threaded
buttons
securing
decorative
indicators.
Leaks,
moisture
and
obstructions
in
cover
to
panel
and
remove
cover.
pitot
system
will
result
in
false
airspeed
indications,
b.
Remove
nuts
from
shock-mounts,
tag
and
dis-
while
static
system
malfunctions
will
affect
readings
connect
instrument
wiring
and
plumbing
and
pull
panel
of
all
three instruments.
Under
instrument
flight
straight
back.
conditions,
these
instrument
errors
could
be
hazar-
c.
Reverse
preceding
steps
for
installation.
En-
dous.
Cleanliness
and
security
are
the
principal
sure
ground
strap
is
properly
installed.
rules
for
system
maintenance.
The
pitot
tube
and
static
ports
MUST
be
kept
clean
and
unobstructed.
15-6.
SHOCK
MOUNTS.
Service
life
of
instruments
is
directly
related
to
adequate
shock-mounting
of
15-13.
STATIC
PRESSURE
SYSTEM
INSPECTION
panel.
If
removal
of
panel
is
necessary,
check mounts
AND
LEAKAGE
TEST.
The
following
procedure
for
deterioration.
outlines
inspection
and
testing
of
static
pressure
system,
assuming
altimeter
has
been
tested
and
in-
15-7.
INSTRUMENTS.
spected
in
accordance
with
current
Federal
Aviation
Regulations.
15-8.
REMOVAL.
(Refer
to
figure
15-1.)
Most
in-
a.
Ensure
static
system
is
free
from
entrapped
struments
are
secured
to
panel
with
screws
inserted
moisture
and
restrictions.
through
panel
face.
To
remove
an
instrument,
re-
b.
Ensure
no
alterations
or
deformations
of
air-
move
decorative
cover,
disconnect
wiring
or
plumb-
frame surface
have
been made
which
would
affect
ing
to
instrument,
remove
mounting
screws
and
take
the
relationship
between
air
pressure
in
static
pres-
instruments
out
from
behind,
or
in
some
cases,
from
sure
system
and
true
ambient
static
air
pressure
for
front
of
panel.
Instrument
clusters
are
installed
as
any
flight configuration.
units
and
are
secured
by
a
screw
at
each
end.
A
c.
Attach
a
source
of
suction
to
static
pressure
cluster
must
be
removed
from
panel
to
replace
an
source
opening.
Figure
15-3
shows
one
method
of
individual
gage.
In
all
cases
when
an
instrument
is
obtaining
suction.
removed,
disconnected
lines
or
wires
should
be
pro-
d.
Slowly
apply
suction
until
altimeter
indicates
a
tected.
Cap
open
lines
and
cover
pressure
connec-
1000-foot
increase
in
altitude.
tions
on
instrument
to
prevent
thread
damage
and
entrance
of
foreign
matter.
Wire
terminals
should
CAUTION
be
insulated
or
tied
up
so
accidental
grounding
or
short-circuiting
will
not
occur.
When
applying
or
releasing
suction,
do not
exceed
range
of
vertical
speed
indicator
or
15-9,
INSTALLATION.
Generally,
installation
pro-
airspeed
indicator.
cedure
is
the
reverse
of
removal
procedure.
Ensure
mounting
screw
nuts
are
tightened
firmly,
but
do
not
e.
Cut
off
suction
source
to
maintain
a
"closed"
over-tighten,
particularly
on
instruments
having
system
for
one
minute.
Leakage
shall
not
exceed
plastic
cases.
The
same
rule
applies
to
connecting
100
feet
of
altitude
loss
as
indicated
on
altimeter.
plumbing
and
wiring.
f.
If
leakage
rate
is
within
tolerance,
slowly
re-
lease
suction
source.
NOTE
All
instruments
(gages
and
indicators),
requiring
a
thread
seal
or
lubricant,
shall
be
installed
using
If
leakage
rate
exceeds
maximum
allowable,
teflon tape
on
male
fittings
only.
This
tape
is
first
tighten
all
connections,
then
repeat
I
available
through
Cessna
Parts
Distribution
leakage
test.
If
leakage
rate
still
exceeds
(CPD
2).
maximum
allowable,
use following
procedure.
When
replacing
an
electrical
gage
in
an
instrument
g.
Disconnect
static
pressure
lines from
airspeed
cluster
assembly,
avoid
bending
pointer or
dial
indicator
and
vertical
speed
indicator.
Use
suitable
15-2
Change
1

Table of Contents