EasyManua.ls Logo

Cessna 172P - Page 249

Cessna 172P
358 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PILOT'S OPER,ATING
I{ANDBOOK
SUPPLEMENT
I
1ryINTERIZATION
KIl
MODEL
172P
SUPPLEMENT
WINTERIZATION KIT
SECTION
1
GENERAL
The
winterizatiott
kit consists
of tnto
cover
plates (with placards)
which
attach to
the air
intakes
in
the
cowling
nose
cap,
a
restrictive
oover
plate
for the
aft side
of the
oil oooler,
insulation for the
engine
crankoase
breather
line, and
a
placard
to be installed
on the
instrument
panel.
This
equipment
ehould
be
installed
for
operations
in
temperatures consistently
bolow 20'F
(-?oC).
Once
installed,
the crankcase breather
insulation
is
approved
for
permanent
use,
regardless of temperature.
SECTION
2
L¡MITATIONS
The following
inforrnation must be
presented
in
the form
of
placards
when the airplane
is equipped with
a
winterization
kit.
1.
On each
nose cap cover
plate:
REMOVE
1VHEN
OAT
EXCEEDS
2O'F
2. On
right
hand nose
cap cover
plate:
R,EMO\/E OIL
COOLER COVER
PLATE
FROM
.A'F'T SIDE OF OIL COOLER
WHEN OA'T
EXCEEDS
zO"F
30 May 1980
1of
2

Table of Contents

Other manuals for Cessna 172P

Related product manuals