35
Installation and Maintenance Log
Reference Information
Circuit Number
Circuit Breaker Number
Drawing Number
Circuit Length
Heat Tracing Visual Checks
No Signs of Moisture, Corrosion
or Damage
Initial
Date
Proper Electrical Connection
Initial
Date
Proper Grounding of the Braid
Initial
Date
Heat Tracing Electrical Checks
Megger Test (500 VDC)
(Bypass Controls)
Meg Ohms
Date
Amperage Draw Test
Compare to design Amperage
Draw
Amperage
Amp. Temp
Date
Voltage at end of Circuit*
Voltage
Date
Accessories/Control Checks
Temperature Control Properly Set
Setpoint
Date
Sensors Protected and
Undamaged
Initial
Date
All Enclosures and Kits Closed
and Sealed
Initial
Date
Thermal Insulation Checks
Location of Kits Visible on Outside
of Insulation
Initial
Date
Insulation is Complete, Dry and
Weatherproof
Initial
Date
* This test must be performed at installation or at any time the cable is cut or damaged in any way.