Chapter 3 Installing the Switch
Rack-Mounting the Switch
3-8
Catalyst 4900 Series Switch Installation Guide
78-18039-02
–
If the chassis front panel is in the front of the rack, insert the rear of the
chassis between the mounting posts.
–
If the rear of the chassis is in the front of the rack, insert the front of the
chassis between the mounting posts.
b. Align the mounting holes in the L bracket with the mounting holes in the
equipment rack.
c. Secure the chassis using four (two on each side) 12-24 x 3/4-inch screws
through the elongated holes in the L bracket and into the threaded holes in the
mounting post.
d. Use a tape measure and level to ensure that the chassis is installed straight and
level.
Figure 3-3 Installing the Switch in the Rack
Step 4 Attach the cable guide to the right or left side of the chassis mount.
S
T
A
T
U
S
F
A
N
P
S
2
P
S
1
C
O
N
C
a
t
a
l
y
s
t
W
S
-
C
4
9
4
8
1
0
G
E
M
G
T
1
1
6
1
7
3
2
3
3
48
X2-1
X2-2
130087