Step 3 Tighten the screws to a torque of 5 to 6 in-lbs.
Step 4 After the cover is in place, the antennae can be attached to the pluggable modules, as needed. The following
figure shows the final assembly.
Cisco Catalyst IR1800 Rugged Series Router Hardware Installation Guide
74
Installing the IP54 Kit
Installing the Back Cover