Introduction
This section describes the behavior of the front panel indicators when
the Residential Gateway is first powered up, during normal
operations, and in special conditions.
Operation of Front Panel
In This Chapter
Initial Power Up, Calibration, and Registration (AC Power
applied) ...............................................................................................38
Normal Op eratio ns (AC Power Applied) ........................................40
Special Conditions ..............................................................................41