EasyManua.ls Logo

Cisco P-LTE-MNA - ROM Monitor Overview; ROM Monitor Introduction

Cisco P-LTE-MNA
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Both options - A and B should follow these remaining steps to complete the mounting procedure:
1. Assemble dongle, USB, cable and antenna together in advance.
2. Pick up the wall-mounting bracket (700-121609-01) and 2 SCREWS (48-0580-01).
3. Align and fasten the screws.
4. Plug the USB cable to the USB port on the chassis to complete the mounting procedure.
Hardware Installation Guide for the Cisco 1000 Series Integrated Services Router
73
Install and Upgrade Internal Modules and Field Replaceable Units
Option A - Rack Mount at the Same Height with the Platform

Table of Contents

Related product manuals