Do you have a question about the Cleaver-Brooks ClearFire CFLC-12000 and is the answer not in the manual?
Covers general gas connection requirements and specific gas train components.
Explains how to make electrical connections to the boiler, emphasizing safety.
Discusses appliance categories and flue venting system design principles.
Details requirements for adequate and uncontaminated air supply for combustion.
Guides users through verifying and changing Falcon controller settings.
Outlines the step-by-step process for the initial startup of the boiler.
Explains the basic burner sequencing steps managed by the Falcon controller.
Offers guidance on diagnosing and resolving common lockout conditions and light-off problems.
Covers the initial installation and startup procedures for Falcon lead lag systems.
Summarizes the functional capabilities of the embedded lead-lag control.
Describes the general operation and setup procedures for the lead lag master controller.
| Model | CFLC-12000 |
|---|---|
| Capacity | 12, 000 MBH |
| Fuel Type | Natural Gas |
| Thermal Efficiency | Up to 99% |
| Design Pressure | 160 psi |
| Operating Pressure | Up to 150 psi |
| Heat Exchanger | Stainless Steel |
| Control System | Advanced PLC Control |
| Turndown Ratio | 10:1 |
| Emissions | Low NOx |
| Boiler Type | Firetube |
| Efficiency | Up to 99% |
| Modulation | Modulating |