EasyManua.ls Logo

CleaverBrooks 4WI - Page 23

CleaverBrooks 4WI
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
750-211 (revised 2009)
Promethean Boilers, Model 4WI Manual
1-9
1.6 — IFGR Components
On dual-fuel boilers with two jackshaft drive arms, as defined above, a proximity switch is used to prove that the
correct linkage connection is made. (Refer to the wiring diagram provided with the boiler.)
FIGURE 1-11. Cross Section of Front Head
FIGURE 1-12. Over-Travel Mechanism and Fuel Changeover Linkage

Table of Contents

Related product manuals