750-204
Profire D/LND
2-5
2.4 — Packing Plastic Refractory Around Oven
FIGURE 2-4. Scotch Marine Burner Mounting Details
2.4 — Packing Plastic Refractory Around Oven
The area between the outside circumference of the dry oven and existing refractory should be packed with Kaiser
Refractory Mono T-9 Airset or equal within two hours after coating the dry oven with Trowleze. From inside the
furnace, ram plastic refractory from the front to the rear parallel to the outside surface of the dry oven.
2.5 — Separate Compressor Module
For oil burners supplied with the separate compressor module, piping to the burner is installed as shown in Fig-
ure 2-5. Earlier models have the oil cooler finned coil located below the damper. The earliest units used a coil in
It is important that you provide support for the housing when in the open position to prevent damage to the hinges
and subsequent components.
!
Caution