EasyManua.ls Logo

CLIVET CAS-182 - Unit Start-Up Procedures; Preliminary Checks Before Start-Up; Start-Up Sequence Operations

CLIVET CAS-182
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
7 - START-UP
Preliminary checks
Checks with machine in OFF, before start-up .
For details refer to the various chapters in the manual.
√
•
safe access
•
functional spaces
•
air flow: free return and supply (no bypass, no
stratification)
•
integrity of structure
•
fans turn freely
•
unit on anti-vibration devices
•
Unit input water filter + shut-off valves for cleaning
•
Vibration isolators on water connections
•
Expansion tank (indicative volume = 5% system content)
•
Cleaned system
•
Loaded system + possibile glicole solution + corrosion
inhibitor
•
Under pressure system
•
Vented system
•
cooling circuit visual control
•
earth connection
•
unit powered by fixed network or by electrogen group
•
electric connections by customer
Start-up sequence
√
•
Powered unit
•
compressor carter heaters ON from at least 8 hours
•
phases sequence control
•
vacuum voltage measurement
•
unit ON
•
load voltage measurement and absorptions
•
fans operation check
•
treated air flow rate measurement
•
supply, return and outdoor air temperature measurement
•
subcooling and overheating measurement
•
no anomalous vibrations check
•
static pressure relief in return
•
set date and time
•
set-point customisation
•
available machine documentation
Machine start-up operations.
For details refer to the various chapters in the manual.