7
3 - POSITIONING
A
300
300
500
EVH SPACE A
21-71 550
81-101 620
Unit has been designed to be installed:
• inside
• in fixed positions
Limit vibration transmission:
• use antivibration devices on unit bearing/supporting points;
• install flexible joints on the hydraulic/ aeraulic/cooling
connections.
• plan in the false ceiling the openings indicated in the
functional clearances to allow the access to the unit for
the maintenance operations
• Ceiling positioning : let free the projection to the ground
of the unit and of the functional clearances to allow the
access with ladders or other means
Installation standards:
• Safe accessible position;
• avoid flood-prone places;
• verify unit weight and bearing point capacity;
Operate in compliance with safety regulations in force .
For detailed information (dimensions, weight, technical
characteristics etc.) please refer to the “Technical information”
section.
Use single protection devices : gloves, glasses ecc. .
During positioning consider these elements :
• technical spaces required for the machine and system
• place where the machine will be installed
• electrical connections
• water connections
• air / aeraulic ducts
Do not considerer these elements could decrease
performances and operational life of the unit.
3.1 PRELIMINARY INFORMATION
3.2 POSITIONING
The functional clearances have to :
• guarantee the unit good operating
• allow the maintenance operations
• safeguard the authorized operators and the exposed
person.
• position the unit taking into consideration the clearances
indicated in the figure.