EasyManua.ls Logo

Coffee Queen TOWER - General Information; Function Description; Bulk Brewer Operation; Startup Procedure

Coffee Queen TOWER
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21.
2. General. Tower.
Coffee Queen TOWER 2x5-Litre
We congratulate to your choice of Tower coffee machine.
The brewer is equiped with full and half brew function.
and a separate outlet for hot water.
Tower is delivered with a brew unit, 2 serving stations
and filter holder. ( 6 adjustable feet).
Coffee Queen AB is certified ISO 9001 and 14001
and therefore a minimal stress of the enviroment.
3. Function description - General
TOWER bulk brewer
Coffee brewer with automatic water supply.
It is also equipped with a separate outlet for hot water.
Brewing takes place in removable serving stations.
Brewing is carried out in paper filters. (filter 523).
Brew time for 5 ltrs. approx. 7min.
4. Start up - General
Turn on the main switch, push on/off.
The machine is now filling and will start heating water.
Machine is ready for brewing when ”Display” lights up
and the correct temperature has been reached. (A)
(approx 17 minutes).

Other manuals for Coffee Queen TOWER

Related product manuals