24.
7. Installation and start. TOWER
7.1.
Place the brewer unit on a flat, level and
waterproof surface.
7.2.
Connect the brewer unit to a coldwater feed -1/2"R with connection tube
supplied.
Connection to a closable valve is recommended.
In areas with high level lime problem, a descaling filter should be mounted.
6 adjustable feets.
CAUTION!
Connection to a separate 3 phase only
- Brewer should be connected to 380 V with Zero and earth.
- Use 16 Amp fuses.
IMPORTANT!
Electrical installations must be done of an certificated electrician.
380 V 3 - phase + Zero + earth 9000W