EasyManua.ls Logo

Coffee Queen TOWER - Brewing Operation - Brewing; Starting the Brewing Cycle

Coffee Queen TOWER
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Operating instructions. (Brewing with coffee) TOWER
8.6. Start brewing .
1. Push button 1/1 for 5 litre.
2. Push button 1/2 for 2,5 litre.
Display shows:
When Brewing is ready.
The ”Brewing” indicator
lamp will lit.
3. STOP / PAUSE button
- Press button once for interval position.
- Press button twice to stop brewing.
To complete brewing in interval position
press ½ alt. 1/1.
TAPING HOT WATER It is possible taking
hot water while brewing coffee.
NOTE!
On the brewer unit, a water tap is placed for
serving hot water.
You can as a maximum taping 2 pitchers (1.8litre)
of hot water, while brewing coffee on 1 serving station .
27.

Other manuals for Coffee Queen TOWER

Related product manuals