Disconnect the connector of the microswitch and controller
Undo the screw and remove the controller assembly
fig. 8
Undo the four modulation cone cover fixing screws.
Remove the spring and replace the modulation cone (ref. 1 - fig. 8) with one suitable
for the new type of gas, making sure the gasket (ref. 2 - fig. 8) is correctly positioned.
fig. 9
Undo the four burner fixing screws and pull out the tray.
fig. 10
Replace the nozzles at the main burner and pilot burner, fitting the nozzles indicated
in the technical data table in cap. 5, depending on the type of gas used
Apply the sticker, contained in the conversion kit, near the data plate as proof of the
conversion.
4.2 Commissioning
Before lighting the water heater
Check the tightness of the gas system.
Fill the hydraulic system and make sure the air in the water heater and system is
completely vented.
Make sure there are no water leaks in the system and unit.
Check the correct gas pressure value.
Make sure there are no flammable liquids or materials in the immediate vicinity of
the water heater.
Checks during operation
Turn the unit on.
Check the tightness of the fuel circuit and water systems.
Check the efficiency of the flue and fume ducts when the water heater is operating.
Check correct lighting of the water heater by turning it on and off several times.
Make sure the fuel consumption indicated on the meter matches that given in the
technical data table on cap. 5.