Compu Pool CPSC Series Manual 14
7.5.15 Figure 4 - Bonding.
8.0 INSTALLATION CHECKLIST
8.1.1 Barrel unions installed and glued into pipe work
8.1.2 Barrel unions tightly connected into the cell housing.
8.1.3 Titanium blade assembly is tightly fitted into the clear cell housing.
8.1.4 The mounting bracket is securely affixed to wall or support.
8.1.5 The power unit is mounted in place to the metal backing bracket.
8.1.6 The power unit is connected to correct power source.
8.1.7 The cell cord from the Power Unit is connected to the cell.
8.1.8 Sufficient salt has previously been added and fully dissolved into pool water.
8.1.9 You have checked and confirmed that the Power Unit switches ON and OFF with
the filter pump.
8.1.10 You have checked all connections and joints for leaks.