EasyManua.ls Logo

Confer Plastics CCX-AG - Step 33: Install Second Base Tread; Step 34: Install Long Handrail Post; Step 35: Install Small Flex Riser and Tread; Step 36: Install Third Base Tread

Confer Plastics CCX-AG
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONFER CURVE STEP ADD-ON INSTRUCTIONS (Contʼd.)
Install the second tread
[I] onto the base step
Step 33
Install the long handrail
post [L] into the upper
slot on add-on panel,
slot is marked
with #4.
Step 34
Repeat step 31 to install
the small flex riser [R]
then place the small
curved tread [S] over the handrail post
and attach the same as step 32.
Step 35
Install the third
tread [I] onto
the base step
Step 36
Slide the tread filler [T]
down between the hand
rail post and panel.
Step 37
Attach the tread extension
[U] onto the step panel [A].
Step 38
The last [Top] tread
installs different
from the previous
three. To install the
last tread [I] place
over the four tabs
located on panel
extension [D].
Using a rubber
mallet strike the
top of the tread
directly over the
tabs until seated.
Step 39
Install the two handrail
posts [E] into side panel
[A] by following steps 13
and 14. The other
two handrail posts
[E] will not be
used, save as
spare parts
or recycle.
Step 40
Place one of the
deck connectors
[F] over the
upper hand rail
post and slide
down. Check to
make sure [This
side down] is
facing down-
ward. Repeat
to install the
second part [F].
Step 41
Place handrails
[G] over the top
of handrail posts
and push down
to lock in place.
Step 42
FOLLOW STEPS
17 AND 18 TO
PLACE STEP
IN POOL.
7
prpd.Confer-CurveStepAG-USr11:Confer-Step-1_R1 2/19/13 2:55 PM Page 7

Related product manuals