EasyManua.ls Logo

Contractor CAB-110P - Replacement Parts

Contractor CAB-110P
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
CONTRACOR
®
CAB-110P/CAB-135P Art. 15205/15206
29
7. Replacement parts
electricity. The cabinet must be grounded to prevent static build-up. See Sections 4.1.
If shocks persist, the operator may be building up static. Attach a small ground wire
(such as a wrist strap) from the operator to the cabinet.
6.12.2 Avoid holding parts off the grating. Static will buildup in the part if not dissipated
through the metal cabinet.
6.13. Dust leaking from dust collector
6.13.1 Damaged or loose cartridge. Inspect lter cartridge.
6.13.2 Faulty seal on the dust collector door. Inspect seal and replace if damaged.
7.1. Blast machine assembly
3
4
15
1
19
2
16
17
22
21
20
18
5
23
24
9
13
11
25
14
12
10
8
7
6
Picture 13. Blast
machine, assembly
drawing