Do you have a question about the Cooper SMP 16/SG and is the answer not in the manual?
Guides on setting up relationships and specific parameters for components.
Explains how to use security features to protect substation devices and data.
Steps to add instances for devices the gateway needs to access.
Process of defining all data points for a connected device.
Guides on validating and testing the SMP Gateway configuration before deployment.
Steps to create slave protocol instances for control center communication.
Setting up TCP/IP connections for slave components to communicate with control centers.
Steps to enable the commissioning feature via SMP Config.
Procedure to start a commissioning session through the web interface.
How to force input points to specific values to test configuration and SCADA reporting.
Steps to set up an SMP Gateway as a slave for interconnection with another gateway.
Steps to configure an SMP Gateway as a master for receiving data from a slave gateway.
How the SMP Gateway helps meet NERC CIP cyber security standards.
Steps to customize security settings, define users, groups, and policies.
Configuring password rules, account lockout, and unlock parameters.
Steps to identify devices and configure passthrough connection settings in SMP Config.
How to configure master protocols to retrieve and store event files from devices.
Steps to activate the Annunciator option, requiring updated software and license.
Setting up conditions for analog and binary inputs to trigger alarms.