ABCDEFGH IJKL
| Page 5
ONE SD-LAN Head
End Equipment
Quick Installation Guide
SD-LAN-000-HEEQUIP
Qucik Installation I SD-LAN-000-HEEQUIP
2 Suggested Rack Layout |
Patch Panel
NOTE: Above is a suggested layout
for the Head Equipment in rack.
Specic deployments may require
dierent layouts of equipment.
p/n: CCH-04U, CCH-03U,
CCH-02U, CCH-01U
Power Supply Unit
OLT p/n:1LAN-SDOLT-0588
or 1LAN-SDOLT-0587
Software Dened Data Plane (SDDP) p/n:1LAN-SDDP-48P
p/n:1LAN-SRV-50195L
Virtual App Host / Server
Jumper Management Panel p/n: CJP-01U
p/n: PSU6-1U