Do you have a question about the CORNING CCH-01U and is the answer not in the manual?
Model | CCH-01U |
---|---|
Manufacturer | Corning |
Housing Color | Black |
Units per Rack | 1U |
Power Supply | Not Applicable |
Operating Temperature | -40°C to 75°C |
Mounting | Rack Mount |
Interface | Fiber Optic |
Humidity | 95% non-condensing |
Storage Temperature | -40°C to 85°C |
General safety warnings regarding laser light exposure and eye protection.
Precautions for handling sharp glass fibers and using sharp-bladed tools safely.
Recommendation to wear cut-resistant gloves for protection against sharp-bladed tools and armored cable.
Lists the contents of the CCH-01U housing and its hardware kit.
Lists the contents of the CCH-02U housing and its hardware kit.
Lists the contents of the CCH-03U housing and its hardware kit.
Lists the essential tools required for installation, including screwdrivers and pliers.
Lists various optional materials required for installation, ordered separately.
Details the preferred method for mounting an empty housing into a rack from the front.
Procedure for mounting the housing with a 3-inch projection from the rack front.
Procedure for flush-mounting the housing into a rack from the front.
Procedure for mounting a fully loaded housing into the rack from behind the rack.
Procedure for mounting a fully loaded housing into the rack from the front.
Instructions for flush-mounting an empty housing into a cabinet or enclosure.
Steps to open the housing and access internal components for direct termination.
Procedures for preparing cables for direct termination, including stripping.
Methods for performing sheath retention to secure the cable within the housing.
Instructions for routing fiber optic cables within the housing.
Steps for cleaning and mating fiber optic connectors in adapters.
Procedure for installing the completed sliding tray back into the housing.
Detailed steps for installing two splice or storage cassettes into the housing.
Procedure for installing one cassette and one adapter panel into the housing.
Steps for routing jumper cables (patch cords) through the housing.
Guidance on accurate recordkeeping for fiber identification and panel labeling.
Instructions on how to secure the housing covers to prevent unauthorized access.
Procedure for securing the sliding shelf to prevent movement.
Information on using an optional lock kit to secure the housing doors.