COSMO High-efficiency pump CPH 2.0 47
8. COMMISSIONING, FUNCTIONAL TEST,
SHUTDOWN, DISPOSAL
When the work described in the chapter "Installation" has been completed, the device
is ready for first commissioning. Commissioning must be done by the system's
contractor or by an assigned expert.
8.1 Commissioning and functional test
Only the COSMO CPH 2.0 has an automatic venting function: Pressing the "Mode"
button for 3 seconds activates the function for 1 minute at max. speed, after which the
pump returns to the adjusted operating mode.
All switch-on operations must be done with the cover of the CPH 2.0 control panel
closed.
The system may not be switched on before all electrical and hydraulic
connections have been made.
Do not start the circulation pump without water in the system.
When all the electrical and hydraulic connections have been made, the system
must be filled with water that might contain glycol (max. proportion of glycol:
30%), and then switch the system on.
The medium in the plant can be very hot and under high pressure, and could
escape as steam. RISK OF BURNS!
Touching the circulation pump could be dangerous. RISK OF BURNS!
After the system has been switched on, the operating mode can be adapted to
the requirements of the plant