EasyManua.ls Logo

CPS BlackMax 2 Valve Series User Manual

CPS BlackMax 2 Valve Series
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BCK
®
  
DIGITAL SERIES
us tent No. 9,3,161
OWNER'S MANUAL (English)

 
 
Test Equipment Depot - 800.517.8431
- 99 Washington Street Melrose, MA 02176
TestEquipmentDepot.com
Question and Answer IconNeed help?

Do you have a question about the CPS BlackMax 2 Valve Series and is the answer not in the manual?

CPS BlackMax 2 Valve Series Specifications

General IconGeneral
BrandCPS
ModelBlackMax 2 Valve Series
CategoryMeasuring Instruments
LanguageEnglish

Summary

Quick Start Instructions

General Safety Instructions

Crucial safety guidelines for operating the manifold.

Controls and Features

Detailed explanation of the manifold's buttons, ports, and components.

Initial Operation

Setting to Zero Pressure

Pressure and Vacuum Hold Testing

Pressure Hold Test

How to conduct a pressure hold test to detect large leaks in a system.

Vacuum Hold Test

How to perform a vacuum hold test to check system seal integrity.

Programming and Setting Units

Change Refrigerants

How to change the factory-programmed refrigerants on the manifold.

Setting Auto Power Off (APO)

Connecting to an A/C System

Recovering Refrigerant

MD50 2 Valve Recovery Steps

Step-by-step guide for recovering refrigerant with the MD50 manifold.

MD100 4 Valve Recovery Steps

Step-by-step guide for recovering refrigerant with the MD100 manifold.

Evacuating Procedures

MD50 2 Valve Evacuation

Steps for evacuating the system using the MD50 manifold.

MD100 4 Valve Evacuation

Steps for evacuating the system using the MD100 manifold.

Low Side Charging Procedure

MD50 2 Valve Low Side Charge

Steps for charging refrigerant into the low side with the MD50 manifold.

MD100 4 Valve Low Side Charge

Steps for charging refrigerant into the low side with the MD100 manifold.

High Side Charging Procedure

MD50/MD100 High Side Charge

Steps for charging refrigerant into the high side with the MD50/MD100 manifold.

Battery Selection and Replacement

Error Indicator Screens

Related product manuals