EasyManua.ls Logo

Craftsman 2000 Series - Step 6: Install Leveling Feet; Step 7: Attach Doors and Magnet

Craftsman 2000 Series
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Square unit
Items Needed:
Leveling Foot (Qty: 4)
Process:
• Install (4) leveling feet. Some adjustments may be
necessary after cabinet is in desired location.
• Place the cabinet in its upright position.
• Square the cabinet and wrench tighten all bolts. (Do
not tighten screws holding slider in place on middle
shelf.)
Items Needed:
#8 - 32 x 3/8" Pan Head Screw (Qty: 16)
Single Bitted Lock (Qty: 1)
Magnet (Qty: 1)
NOTE: Lock on the 48-inch wide oor cabinet is not
installed. Install before attaching door.
Screw
Right
Door
Process:
• Ensure lock on right side door is in the unlock position.
• Attach right side door as shown, using (8) screws.
• Adjust door for optimum performance before tightening
screws.
• Attach magnet to middle shelf to hold right door closed.
• Attach left side door in the same manner.
Magnet

Related product manuals