EasyManua.ls Logo

Crosswater MPRO - Positioning Bath for Waste Connection; Securing and Levelling

Crosswater MPRO
2 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
N2 - 2
5
6
7
4x
4
24H
Place the bath on two wooden blocks over the waste
connections. Connect the waste. Fill the bath with water
and check for leakage.
Place the wedges in position.
The wedges can now be
disposed of.
1. Do not drill through the side of the bath for the waste
connection, only where the overflow template is
provided. Waste pipe is through floor access only.
2. Do not place underfloor heating directly below the
product.

Other manuals for Crosswater MPRO

Related product manuals